Balannup Drain Rehabilitation Project

During 2017 the Balannup Drain was approved for further rehabilitation to provide a sustainable living stream and revegetated corridor. This project is the continuation of works undertaken during 2017 which included the installation of jute matting to the drain. The stage of works that will commence early 2018 will consist of primarily hard works with boardwalks, bridges, decking, pathways and seating that can be utilised by the community. Erosion control, culverts, fencing  and retaining walls will be installed in preparation for the soft works component which will follow in the second stage of works that will include the revegetation of the drain. Existing vegetation will be retained during the construction works. At the completion of the project the community will be able to take advantage of walkways and seating through a natural living stream environment. 

 